· Français  · Español  · العربية

•  Since 1997, we have undertaken all the equipment transportation for Petroleum Refinery Phase 1 Project of PetroChina and Sinopec with total investment of USD 700 million in Sudan, with cargo aggregate of 230,000 m3;

•  Phase 2 of refinery expansion and southern oilfield project,with transportaion aggregation of 180,000 m3

•  More than 140 sets of drilling rigs and supporting equipment with about 900,000 m3 for GREATWALL DRILLING COMPANY; 120,000 m3 of construction equipment; 80,000 m3 of exploration equipment, 12000 MT of seismic explosive columns and electric detonators; 30,000 m3 of radioactive perforating bullets and various apparatus trucks; and 70,000 m3 of equipment

•  In June,2005, the LELI ship transported 6000 m3 of 70L drilling rigs from new port of Tuha Oilfield to Sudan

•  From 2005 to 2007, 80000 m3 of 50D and 70D drilling rigs and work over rigs for New Star Company of Sinopec in Egypt

•  In June and July 2006, approximate 10000 m3 cargo of 70D drilling rigs for Sinopec in Saudi Arabia

•  In October 2006 and October 2007, 20000 m3 of 2 sets same drilling rigs for Sinopec in Nigeria, and successfully accomplished the transportation tasks

•  From 2002 up to now, approximate 30000 m3 cargos for Petrol China projects in Mozambique, Tanzania, South Africa, Senegal, Sierra Leone, etc

•  From June 2006 to December 2007, the company has undertaken more than 2000 containers shipment tasks for over 20 projects in Sudan, and approximate 450 container shipment tasks to over 10 countries including Sudan, Cuba, Algeria, Venezuela, Syria, U.S., Pakistan, Peru, and Oman, etc.

•  From 2008 till now, we have been accepting consignment of the two cement production lines project of Tianjin Cement Design Research Institute with daily capacity of 5000 MT cements to Egypt, currently have completed transportaion of 60000m3 of the equipments.

All copyrights, Beijing High-rung Trans International Freight Co.Ltd 1998-2009

Tel: +86 10-63795138 Fax: +86 10-63795238